Kamis, 30 April 2020

Update Laporan Pembangunan Musholla Sunan Gunung Jati Junwatu Junrejo Batu Maret-April 2020

Jazakalloohu Khoir Untuk Para Donatur, Semoga Alloh SWT Membalas dengan kebaikan setimpal.. Aaminn


DAFTAR PENGELUARAN DANA SOSIAL
PEMBANGUNAN FASILITAS UMUM (MUSHOLLA)
PP DARUL MUTTAQIN BATU
TAHUN 2020
No  Tanggal Jenis Kegiatan Pemasukan Pengeluaran
1 28 Februari 2020 Infaq (KA)            10,000,000.00  
2 2 Maret 2020 Belanja Galvalum              5,256,000.00
3 2 Maret 2020 Belanja Keramik              1,588,000.00
4 2 Maret 2020 Belanja Bata, Pasir, Semen              1,695,000.00
5 2 Maret 2020 Belanja Gamping                  110,000.00
6 8 Maret 2020 Infaq (KA)            10,000,000.00  
7 8 Maret 2020 belanja besi dan papan utk musholla dau              1,421,000.00
8 14 maret 2020 belanja pasir, semen dll              2,534,000.00
9 14 maret 2020 Ongkos Tukang              2,350,000.00
10 16 maret 2020 semen; pasir              2,385,000.00
11 17 maret 2020 Infaq (KA)            10,000,000.00  
12 17 maret 2020 Infaq (I.Z.)            20,000,000.00  
13 17 maret 2020 Tambahan infaq               2,500,000.00  
14 17 maret 2020 bendrat                    33,000.00
15 17 maret 2020 belanja besi 1              4,656,250.00
16 18 maret 2020 belanja besi 2, paku              7,206,000.00
17 19 maret 2020 kayu basiya                  750,000.00
18 19 maret 2020 triplek 9mm                  880,000.00
19 21 maret 2020 Sesek Bambu                  640,000.00
20 21 maret 2020 Beli Batu Kali 2 x              2,900,000.00
21 21 maret 2020 Ongkos Tukang              2,250,000.00
22 22 maret 2020 Besi 12               1,446,000.00
23 23 maret 2020 Belanja besi               4,500,000.00
24 23 maret 2020 Belanja Batu Bata merah 1000, bodem              1,340,000.00
25 23 maret 2020 Belanja pasir, semen, gamping, koral dll              4,193,000.00
26 25 maret 2020 Infaq KA            20,000,000.00  
27 27 maret 2020 Infaq Okky               1,000,000.00  
28 28 maret 2020 Ongkos Tukang              2,530,000.00
29 1-Apr-20 Mas Ar Jkt                  700,000.00  
30 31 maret 2020 Mb Endang                  500,000.00  
31 2-Apr-20 Batako 1000              3,500,000.00
32 2-Apr-20 Koral 1 truk              1,500,000.00
33 2-Apr-20 Pasir lumajang 1 truk              1,500,000.00
34 3-Apr-20 pensil, kikir, selang                    64,000.00
35 3-Apr-20 kayu basiya                  750,000.00
36 3-Apr-20 Semen              1,530,000.00
37 3-Apr-20 Sesek Bambu                  650,000.00
38 3-Apr-20 Tambang, perlengkapan                    80,000.00
39 4-Apr-20 Ongkos Tukang              2,530,000.00
40 4-Apr-20 sak bekas                  150,000.00
41 4-Apr-20 gergaji besi, gerinda                    86,000.00
42 5-Apr-20 Transport                  200,000.00
43 4-Apr-20 kawat                    45,000.00
44 4-Apr-20 pipa PVC              2,121,000.00
45 5-Apr-20 ArtCo dan Ap boot, sarung tangan dll                  820,000.00
46 6-Apr-20 Kabel dan solasi                  706,500.00
47 7-Apr-20 triplek 9mm                  570,000.00
48 8-Apr-20 Pasir lumajang  dan semen 10 sak                  805,000.00
49 9-Apr-20 Infaq Dedy Eryanto                  500,000.00  
50 10-Apr-20 Infaq N Elmizan                  650,000.00  
51 10-Apr-20 Infaq Aida Nuraini                  300,000.00  
52 11-Apr-20 Sewa Molen                  300,000.00
53 11-Apr-20 Keranjang Cor                  100,000.00
54 11-Apr-20 Semen Gresik                  612,000.00
55 11-Apr-20 Besi 10, 8, 6 50 btg              5,412,500.00
56 11-Apr-20 Ongkos tukang dan pembuat batas longsoran tanah (6 hari)              2,530,000.00
57 11-Apr-20 Konsumsi santri (cor) dan transport                  250,000.00
58 11-Apr-20 Dana Infaq K A            25,000,000.00  
59 11-Apr-20 Dana Infaq Doni               2,600,000.00  
60 11-Apr-20 Tanah Urug                  250,000.00
61 11-Apr-20 Besi 6, 8, 10              5,412,500.00
62 13-Apr-20 Sewa Kayu Penahan Cor                  800,000.00
63 14-Apr-20 Pasir              1,500,000.00
64 15-Apr-20 kayu & triplek 9mm  12 bh              3,200,000.00
65 15-Apr-20 transport                  150,000.00
66 16-Apr-20 Infaq RNA               1,000,000.00  
67 16-Apr-20 Besi 16, 12              1,802,500.00
68 16-Apr-20 Transport                  200,000.00
69 17-Apr-20 Kayu basiya 10              1,500,000.00
70 18-Apr-20 Ongkos tukang               2,530,000.00
71 19-Apr-20 Bambu                  700,000.00
72 20-Apr-20 Stempel                    80,000.00
73 22-Apr-20 Triplex 9 mm 15              1,575,000.00
74 25-Apr-20 Ongkos Tukang              2,260,000.00
75 26-Apr-20 Infaq Mb Har dan Ibu Z               1,100,000.00  
76 27-Apr-20 Besi 16; 12; 10; 8; bendrat              7,494,000.00
77 27-Apr-20 Infaq Sigit dr. Smada               2,000,000.00  
78 28-Apr-20 Infaq M Yuski               3,000,000.00  
79 29-Apr-20 Nurul Hayat               2,550,000.00  
80 29-Apr-20 Semen 50 sak              2,550,000.00
81 29-Apr-20 Semen 10 sak                  510,000.00
82 29-Apr-20 Kabel Ties                    10,000.00
         
    JUMLAH          113,400,000.00       109,999,250.00
    SISA SALDO                                3,400,750.00